CPC Corporation, Taiwan (the original is in the exhibition hall of the Kaohsiung Oil Refinery)
Description:
The main frame of the catalytic cracking unit was installed by the factory itself within two months. The photo was taken during the hanging work of the storage tank on December 18, 1951.