The Industrial Heritage  in Taiwan
Artifacts & Historical Materials Oral History Search Industry Stories About Project Links
:::
  Semiconductor Industry
* Petrochemical Industry
  Food Industry
  Household Appliances Industry
  Steel Industry
  Copper Mould Industry
::: * Artifacts & Historical Materials *
*
* The naphtha cracker unit no. 2 under construction in 1975
Zoom E-card
The naphtha cracker unit no. 2 under construction in 1975
 
Oil tanker Liyun  
On August 30, 1961, the Assistant President and Director Hu Xin-nan was promoted to the position of CEO, and the Vice Director Dong Shi-fen was promoted as the Assistant President and Director.  
Chiang Ching-kuo visiting Chinese Institute of Engineers  
A group photo in the director’s office after presenting a souvenir to the CEO from the representatives of the union and the staff.  
Form
The naphtha cracker unit no. 2 under construction in 1975 ABOUT >>
Source: Weng , Jun-Fa 
Description: The naphtha cracker unit no. 2 under construction in 1975. 
back top
Copyright © 2009 National Science and Technology Museum. All rights reserved.
This website has been visited by 8476819 people.