The Industrial Heritage  in Taiwan
Artifacts & Historical Materials Oral History Search Industry Stories About Project Links
:::
  Semiconductor Industry
  Petrochemical Industry
  Food Industry
  Household Appliances Industry
* Steel Industry
  Copper Mould Industry
::: * Artifacts & Historical Materials *
*
* Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu
Zoom E-card
Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu
 
1986 International Steel Technologies Symposium: Staff of the farewell party  
Ignition of the coke oven no.1 of  the coke factory hosted by president Ma.  
Vice president and Premier Lian Zhan at the Starting Ceremony of BOF no.4 with every president of CSC  
04.5.18 The first phase of steel-making test production  
Form
Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu ABOUT >>
Source: China Steel Corporation 
Description: Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu 
back top
Copyright © 2009 National Science and Technology Museum. All rights reserved.
This website has been visited by 8763033 people.