The Industrial Heritage  in Taiwan
Artifacts & Historical Materials Oral History Search Industry Stories About Project Links
:::
  Semiconductor Industry
  Petrochemical Industry
  Food Industry
  Household Appliances Industry
* Steel Industry
  Copper Mould Industry
::: * Artifacts & Historical Materials *
*
* Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu
Zoom E-card
Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu
 
Ignition of blast furnace no.4 by former president Wang Zhong-Yu  
Guo Yan-Tu and the others visiting the factory  
Wine reception for celebrating the production of molten steel over 10 million tons.  
Steel mill(3)  
Form
Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu ABOUT >>
Source: China Steel Corporation 
Description: Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu 
back top
Copyright © 2009 National Science and Technology Museum. All rights reserved.
This website has been visited by 8597441 people.