The Industrial Heritage  in Taiwan
Artifacts & Historical Materials Oral History Search Industry Stories About Project Links
:::
  Semiconductor Industry
  Petrochemical Industry
  Food Industry
  Household Appliances Industry
* Steel Industry
  Copper Mould Industry
::: * Artifacts & Historical Materials *
*
* Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu
Zoom E-card
Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu
 
Inauguration speech for the establishment of Yaskawa Electric Taiwan Corporation  
Operation of 3A001 facility. NO.3 BOF First Heat  
Ignition of blast furnace no.4 by former president Liu Zeng-Gua  
President Jin Mao-Hui hosting the ceremony for the 3rd Phase extension of the blast furnace.  
Form
Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu ABOUT >>
Source: China Steel Corporation 
Description: Completion ceremony for the replacement of the furnace lining: Ignition of the third campaign hosted by President Wang Zhong-Yu 
back top
Copyright © 2009 National Science and Technology Museum. All rights reserved.
This website has been visited by 8288262 people.